Parks & Facilities

Sports Field & Outdoor Court Status and Availability - the current status and availability of sports fields in Coquitlam can be found on the Sports Field Status page.
View all facilities

Eagle Ridge Outdoor Pool

Subfacility of Eagle Ridge Park

Features

  1. Accessible
  2. Changerooms
  3. Pool - Outdoor
  4. Washrooms
  5. Water Fountain
  6. WiFi

Eagle Ridge Pool is a competitive eight-lane, 25-metre pool. The pool has two diving boards, large change room facilities, as well as large adjoining grass picnic areas.

Hours of Operation

  • May 30 – June 24
    • Saturday/Sunday: 
      • 1 – 8:30 p.m.  Available: min 2 lanes, public swim
  • June 25 – September 7
    • Monday to Friday: 
      • 12:30 p.m. – 4 p.m.   Available: public swim
      • 6 – 8:30 p.m.  Available: min 2 lanes and public swim
    • Saturday/Sunday: 
      • 1 – 8:30 p.m. 
      •  Available: public swim; starting at 5:30 p.m. – min 2 lanes available

Admission

  • $2 per person
  • Cash, debit, credit or gift cards accepted
  • Please note, only those swimming are required to pay pool admission.

Accessible Amenities

  • Accessibility ramp – A 10m long ramp to assist those who prefer or require entry to the pool via a gradual slope.
  • Transfer lift – A mechanical seated lift to assist patrons with transfer to the water wheelchair.
  • Water wheelchair – A wheelchair specially designed for use in and around the pool.

Amenities

  • Lap pool
  • Diving boards (1M and 3M)
  • Deck and lawn areas for lounging and picnics
  • Men's and Women's change rooms
  • All gendered change room
  • Cubbies
  • Washrooms accessible to park and tennis court users

Safety

  • All children under seven years must be accompanied and be in the water, within arms reach, of a responsible adult.
  • Lifeguards are on duty at this pool location.


Facility Maintenance

The pool will be undergoing maintenance from fall 2025 to spring 2026 and will reopen in time for the summer 2026 swim season. The work is part of necessary upkeep to help extend the life of the pool and keep it in good condition for years to come.

Timeline

Crews will be onsite at the pool to start upgrades, including installing scaffolding and surface preparation, from November to December 2025. They will take a break over the end of December before work starts up again in early January. Work in 2026 will include concrete restoration and pool coating / repainting. 

The full project will be completed by spring 2026.