I scheduled a drain tile inspection, do I need to schedule a separate plumbing inspection for the Rainwater Leaders (RWL), Sump, Storm, Sanitary, and Water Services?

Yes, a separate plumbing inspection 435 Outside Services Rough-in includes the following that must be scheduled using the Plumbing Services Permit number:

  • Rain Water Leaders (RWL)
  • Sanitary Sewer
  • Storm Sewer
  • Sump
  • Water Service

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.