BC Hydro is requesting detailed design drawings from the applicant to do their design, are these available?

Detailed design drawings are typically available if a developer has hired a civil consultant to prepare offsite servicing drawings for them. If the Frontage Works Program is offered midstream of the detailed drawing review process then they should be available, otherwise there is a chance that they have not been prepared.

Show All Answers

1. What are the acceptable methods of payment?
2. Are existing BC Hydro leased lights an acceptable solution?
3. As applicant, can I construct the required improvements myself? If so, what do I need to submit and how long do I have?
4. When will ‘my’ fronting street be scheduled for improvements?
5. BC Hydro is requesting detailed design drawings from the applicant to do their design, are these available?
6. What do I need to know about updating the services for my property?
7. Where do I apply for a driveway access permit?